for Maintenance Purposes Only
25 KG / Bag covers an area of around (45 CM length × 45 CM widths × 5 CM depth).
Our Cold Asphalt Features
![5 5](https://albenya.com/wp-content/uploads/2022/12/5.png)
Easy To Use
![4 4](https://albenya.com/wp-content/uploads/2022/12/4.png)
Environment Friendly
![3 3](https://albenya.com/wp-content/uploads/2022/12/3.png)
25 KG Bags
![2 2](https://albenya.com/wp-content/uploads/2022/12/2.png)
Need Simple Equipment
![1 1 1](https://albenya.com/wp-content/uploads/2022/12/1-1.png)
Easy To Transfer
![10 10](https://albenya.com/wp-content/uploads/2022/12/10.png)
Doesn’t disrupt traffic
![9 9](https://albenya.com/wp-content/uploads/2022/12/9.png)
armed with fiberglass
![8 8](https://albenya.com/wp-content/uploads/2022/12/8.png)
Holds together after tamping
![7 7](https://albenya.com/wp-content/uploads/2022/12/7.png)
Any Weather +25°C
![6 6](https://albenya.com/wp-content/uploads/2022/12/6.png)
Easy To Trade
HOW TO USE (CAS–R25)
![44 44](https://albenya.com/wp-content/uploads/2022/12/44.png)
Step 1
Clip the area to be maintained
![22 22](https://albenya.com/wp-content/uploads/2022/12/22.png)
Step 2
Clean the hole & crush the ground well
![website-photo website photo](https://albenya.com/wp-content/uploads/2023/05/website-photo.jpg)
Step 3
Spray the MC and allow the hole to dry for 30 minutes
![444 444](https://albenya.com/wp-content/uploads/2022/12/444.png)
Step 4
Unloading the asphalt bag with the excess asphalt by hand
and compacting it manually
![555 555 2](https://albenya.com/wp-content/uploads/2022/12/555-2.png)
Step 5
Raise the level of asphalt by 5 cm while tamping it manually,
and then start the tamping process
![666 666](https://albenya.com/wp-content/uploads/2022/12/666.png)
Step 6
Sprinkle a quantity of fine sand,
then use the road directly
How To Storage
![8888 8888](https://albenya.com/wp-content/uploads/2022/12/8888.png)
One Pallet Per Stack
It is forbidden to stack the pallet on top, meaning a maximum of one pallet per stack.
Closed Warehouse
Store in a closed warehouse and do not expose the stock to the sun to avoid damage to the product.
Wooden Pallet
It is stored on a wooden pallet of 40 bags per pallet.
Packing
The packaging is carried out in 25 kg bags made of polyethylene.
INFORMATION ON INGREDIENTS
Composition/information on ingredients | % wt | CAS No |
---|---|---|
Aggregate (crushed stone, sand, gravel,slag) | > 85 | Various |
Silica sand Or Quartz sand | < 5% | 14707-60-7 / 14808-60-7 |
Petroleum asphalt / bitumen^ | < 5% | 8052-42-4 |
Additives + Fiberglass | < 5% |
LAB RESULTS
Test | Method | Result | |
Binder Content (%) | ASTM D 2172: 17 | 4.6 | |
Marshall Criteria @ | Stability (kN/N) Flow (mm) Stiffness (kN/mm) Flow (mm) | ASTM D6927: 15 | 23.9/23947 2.2 10.9 |
Marshall Criteria @ | Stability (KN/N) Flow (mm) Stiffness (kN/mm) | ASTM D6927: 15 | 8.8/8769 3.0 2.9 |
Bulk Density of Compacted Mix, Gmb | ASTM D 2726:21 | 2.315 | |
Maximum Theoretical Specific Gravity, Gmm | ASTM D 2041: 19 | 2.565 | |
% voids in Mix (VIM) | - | 9.7 | |
Indirect Tensile Strength (kPa) | ASTM D 6931: 17 | 500 |